DOUAI ABBEY

Development of the Former School Buildings 15



October 16
The last day of the crane's working.

school


October 17
The large crane was dismantled today. It had been in position since June 7 last year.

crane
crane
crane
The jib on the ground.
A section loaded on a lorry.
Going out the gate.
crane
crane
crane
Only a two pieces left,
with two men standing on them.
The last piece
It comes down.
crane
crane
crane
The cab section comes down.
Almost on the ground.
Loaded on the lorry.


October 18
The last section of the crane tower is loaded on to a lorry, ready to depart to Peterborough.

crane
crane
crane
crane
crane



To visit the next page

To return to the previous page

To go straight to the last page

Back to Welcome and Index


Back to TOPDouai Abbey Registered Charity No. 236962
page created 17/10/06, updated 19/10/06, revised 18/02/07
Webmaster, Douai Abbey, Upper Woolhampton, Reading, Berks. RG7 5TQ
e-mail with comments to douaiweb@aol.com